Chaitanya
6de3fdc249
Fix features/ability test
2017-06-21 07:46:14 +05:30
Chaitanya
41ae0279b8
Refactor authorization for schedule action of Conferences Controller
...
Remove can ability for schedule and events action in ability.rb as both the actions are no longer present in conferences_controller. Replace load_and_authorize_resource with load_resource for program in the schedules_controller.
Closes #1457
2017-06-21 07:46:14 +05:30
Ana
1636b458ee
Inform that there are no rooms in the schedule
...
Inform that there are no rooms when creating the schedule with a message instead of creating a room with the title "No rooms". The message also include a link to the place where rooms are created.
2016-08-12 11:33:49 +02:00
Ana
e8261d41bc
Improve Error messages
...
- Improve error messages in event schedules, schedules and program controller.
- Two respond_to blocks in the update method of program controller.
2016-08-11 15:11:27 +02:00
Ana
5761e0f7a4
Using flash instead of alerts in the schedule
...
Using flash instead of alerts in the schedule to notify errors.
Also, a message shown when a schedule is successfully created.
2016-08-11 15:11:27 +02:00
Ana
81108290e5
Schedule update moved to program update
...
Schedule update updated a program attribute
2016-08-11 15:11:27 +02:00
Ana
29b920d746
Corrections in SchedulesController
...
- Controler file name pluralized
- Load and authorization fixed and improved
- Consider that save can fail in create action
- Eliminate unnecessary if in update action
- Ability and tests related to the schedules link in the admin sidebar fixed
2016-08-11 15:11:27 +02:00
Ana
42848f929b
Several schedules in the backend && routes changed
...
- Introduce plural resources for Schedule in routes.rb
- Introduce #index and #create actions for ScheduleController
- Make it possible to set a schedule as selected_schedule
2016-08-11 15:11:27 +02:00
Ana
beb17165a2
Introduce an association for the selected_schedule
...
Association in Program fot the selected_schedule
2016-08-11 15:11:27 +02:00
Ana
0b26ed5c35
EventSchedule validations
...
event, schedule, room and start_time are mandatory in EventSchedule.
2016-08-11 15:11:27 +02:00
Ana
dfd64a4510
Integrate the schedule in the admin interface
...
Integrate the schedule in the admin interface while adapting it to the new associations and models.
2016-08-11 15:06:52 +02:00
David Sedeño
00acf0c255
Fix room_params in scheduler update. fix #771
2016-02-08 22:52:58 +01:00
Henne Vogelsang
8e324ac1af
Fix showing a schedule without venue/rooms
2016-02-08 12:52:56 +01:00
Stella Rouzi
f840f2b3f0
Rooms belong to venue
2016-02-06 17:43:51 +01:00
Stella Rouzi
444356fbc7
Introduce Program to include cfp/rooms/tracks/events/event_types/difficulty_levels
2016-02-06 17:42:51 +01:00
Stella Rouzi
355ecc0ac6
Introduce strong parameters
2015-12-23 11:36:50 +02:00
Stella Rouzi
17ebad413e
base controller
...
Conflicts:
app/controllers/admin/commercials_controller.rb
app/controllers/admin/questions_controller.rb
app/controllers/admin/users_controller.rb
2014-08-14 11:36:07 +03:00
Stella Rouzi
e2fb434dc7
Implement role authorization
2014-08-13 22:53:13 +03:00
Stella Rouzi
43c11133e4
houndci fixes
2014-06-18 19:14:55 +03:00
Stella Rouzi
cda2a0a1ae
fix trailing space, add missing end
2014-06-18 17:40:25 +03:00
Stella Rouzi
9fba9eedc7
hound fixes
2014-06-18 17:40:16 +03:00
Stella Rouzi
37ec4ce746
fix admin schedule routing
2014-06-18 17:40:03 +03:00