Commit graph

14 commits

Author SHA1 Message Date
Ana
eea35c5578 Avoid overlapping in the admin schedule
Not allow that an event is scheduled at the same time than other event in the admin schedule.
2017-01-12 11:52:23 +01:00
Ana
bcff982d3d Introduce bulk :create, :update and :destroy
Introduce bulk :create, :update and :destroy actions to avoid doing several request in the admin schedule.
2017-01-12 11:49:35 +01:00
Ana
6f0cdc64c3 Introduce a "Save" button for the admin schedule
The changes were saved after you drop an event, and now it only saves the schedule when you're done with the changes and click the "Save" button.
2017-01-12 11:37:38 +01:00
Ana
cf5d4e4dbe Make links inside event-panel work with ctrl+click
Function introduce to be used in links inside event-panel to make ctrl + click work.
2016-12-30 13:36:05 +01:00
Ana
aebd5f20a1 Remove unnecessary attributes in osem-schedule.js
Remove unnecessary attributes (schedule and event id) in osem-schedule.js used for update an event.
2016-08-11 15:11:27 +02:00
Ana
a1c7f67735 Render errors in JSON in the schedule correctly 2016-08-11 15:11:27 +02:00
Ana
5761e0f7a4 Using flash instead of alerts in the schedule
Using flash instead of alerts in the schedule to notify errors.

Also, a message shown when a schedule is successfully created.
2016-08-11 15:11:27 +02:00
Ana
310c521790 EventSchedulesController when something goes wrong
Consider that create, update or destroy can fails in EventSchedulesController

Params in remove deleted because they were not used
2016-08-11 15:11:27 +02:00
Ana
2e1cd164a4 Load event schedule fixed
It was needed to use the id instead of the guid in the html attributes of the events in the admin schedule
2016-08-11 15:11:27 +02:00
Ana
57d2a05b7f Use of Rails usl helper instead of interpolation
I also eliminated a duplicated attribute in params
2016-08-11 15:11:27 +02:00
Ana
5001848af7 Introduce an Admin::EventScheduleController
- move SchedulesController#update action
- split it into an #create/#update and #destroy action and use these actions in the JS code
2016-08-11 15:11:27 +02:00
Ana
a394293500 Do not use JS to initialize the schedule
- Only use JS for the drag&drop functionality and to the set/alter the time and rooms of the EventSchedule object.

- Introduce has_many :events, through: :event_schedules association to get unscheduled event easily
2016-08-11 15:11:27 +02:00
Ana
42848f929b Several schedules in the backend && routes changed
- Introduce plural resources for Schedule in routes.rb
- Introduce #index and #create actions for ScheduleController
- Make it possible to set a schedule as selected_schedule
2016-08-11 15:11:27 +02:00
Ana
3f114629f9 javascript for the admin schedule moved to a .js
Inline javascript for the admin schedule moved to a dedicated .js file.
2016-08-11 15:11:27 +02:00